Tees Valley Energy From Waste (TV1 & TV2)

Project Details

Civil Works for the new build TV1 Energy from Waste Plant.

Scope of work included piled foundations largest pour 1100m3, large reinforced concrete structures up to 15m high, large diameter GRE underground pipework and associated services, earthing, drainage, roadworks, etc.


Air Products overall plant build cost is estimated at $350m.


Other packages of work that Tolent completed on this site included initial site set up, cabin facilities, power supply, plant buildings and final surface finishes.

Following the successful completion of the civil work package on the TV1 Energy from Waste Project, Air Products negotiated the TV2 works with Tolent.

This TV2 work scope included 800 no CFA piles (20-25m long), large reinforced concrete bases (up to 1000m3 pours), numerous smaller bases and pile caps, large reinforced concrete structures (up to 15m high), large diameter underground GRE pipework, fire mains, traditional drainage, underground electrical services, tarmac roads and associated gravel landscaping.

Contract Details

Client: Air Products & Chemicals Inc

Project: Tees Valley Energy From Waste

Value: £54m

Search Similar Projects:

Share on Twitter
Please reload

Search By Category

Time Office - Stanley Harrison House

New Ludgate, Mizuho International

Shaftesbury Avenue

The Brasserie, Hudson Quay

1/4
Please reload

Metrovick House

Victoria Halls, Byron Street

The Edge, Westfield Road, Leeds

Reaseheath College

1/3
Please reload

"The Cracker" - Olefins 6 facility, Wilton

Tees Valley Energy From Waste (TV1 & TV2)

Chilton Biomass CCHP Plant

Chilton Foundations

1/2
Please reload

Yarm Medical Centre

Tinshill Medical Centre

Billingham Medical Centre

Linthorpe Medical Centre

1/2
Please reload

Bridon Rope Facility

Trax Park, Doncaster

FHP Factory Unit, Neptune Yard, Walker

Lymedale Distribution Centre, Newcastle under Lyme

1/2
Please reload

Sabic Ole 6 Shutdown, Wilton

Biofuels Corporation Glycerine Plant, Seal Sands

Oikos Storage, Canvey Island, Essex

Polyethylene Plastics Plant, Wilton

1/1
Please reload

Fast Food Outlet, Leeds City Centre

Sports Direct, Ferensway, Hull

Travelodge and Costa Coffee, York

Halbeath Retail Park

1/2
Please reload

Collins Theatre & Apartments, London

Castletown Regeneration

Leafields Development (Southwick)

Pennywell Phase 1 (Hartley Wood)

1/8
Please reload

Time Office - Stanley Harrison House

New Ludgate, Mizuho International

Shaftesbury Avenue

Metrovick House

1/4
Please reload

Newcastle City Library

Wigan Youth Zone

Blackpool Multi Storey Car Park

Seaham Multi-User Centre

1/2
Please reload

© 2016 Tolent Construction Limited (02450574). All trademarks acknowledged. All rights reserved.

Tolent Construction Limited, Ravensworth House, 5th Avenue Business Park, Team Valley, Gateshead, Tyne & Wear, NE11 0HF

  • Twitter Social Icon
  • LinkedIn Social Icon
Tolent Landscape_edited.jpg
  • Grey LinkedIn Icon
  • Grey Twitter Icon