Stobo Castle, Scotland

Project Details

Tolent commenced work in 2002, on the first of four phases:


The first phase and largest was to provide an extension to the Castle to house the new 25m swimming pool, treatment rooms, gym, hydrotherapy areas. The scheme took 52 weeks to complete. The Castle remained open and fully operational throughout the works and it is testament to the planning and co-ordination of the project team that not one complaint was received from a guest during this time about the building works.


Following completion of the extension, Phase 2 looked to refurbish the areas within the castle that were now no longer in use. Former treatment rooms were converted into luxury bedrooms whilst the former hair salon was turned in to a shop and the former shop into a juice bar. All of this work was carried out on nightshift as the areas around these rooms were in use during the day for Spa visitors.


Phase 3 once again saw an area deep within the Castle remodelled. The former 10m swimming pool area was no longer required as the Phase 1 extension housed a new 25m pool. The area was totally gutted, the pool removed and infilled. This created an empty shell from which the Cashmere Suite could be created, the Castles most special area, with a bedroom, dressing room, sitting room, bath room and shower rooms. It is the ultimate in luxury. The centre piece of the suite is a 1 tonne limestone bath carved from a single piece of Turkish limestone. Access and restrictive working made this the most challenging of all phases at Stobo but once again not one complaint was received and the Castle remained fully operational throughout.


The final phase, was the creation of Castle Lodge. A building set away from the main castle building which was converted from the former staff residential quarters into luxury guest bedrooms. Drainage proved to be the biggest challenge for this Phase requiring the installation of a state of the art Sewage Treatment plant to cope with the increased load and to ensure that only clean water was discharged in to the River Tweed, one of the worlds greatest fishing rivers.

Contract Details

Client: Ron Cameron

Project: Stobo Castle Health Spa Extension - New Build

Value: £3.8m

Share on Twitter
Please reload

Search By Category

Time Office - Stanley Harrison House

New Ludgate, Mizuho International

Shaftesbury Avenue

The Brasserie, Hudson Quay

1/4
Please reload

Metrovick House

Victoria Halls, Byron Street

The Edge, Westfield Road, Leeds

Reaseheath College

1/3
Please reload

"The Cracker" - Olefins 6 facility, Wilton

Tees Valley Energy From Waste (TV1 & TV2)

Chilton Biomass CCHP Plant

Chilton Foundations

1/2
Please reload

Yarm Medical Centre

Tinshill Medical Centre

Billingham Medical Centre

Linthorpe Medical Centre

1/2
Please reload

Bridon Rope Facility

Trax Park, Doncaster

FHP Factory Unit, Neptune Yard, Walker

Lymedale Distribution Centre, Newcastle under Lyme

1/2
Please reload

Sabic Ole 6 Shutdown, Wilton

Biofuels Corporation Glycerine Plant, Seal Sands

Oikos Storage, Canvey Island, Essex

Polyethylene Plastics Plant, Wilton

1/1
Please reload

Fast Food Outlet, Leeds City Centre

Sports Direct, Ferensway, Hull

Travelodge and Costa Coffee, York

Halbeath Retail Park

1/2
Please reload

Collins Theatre & Apartments, London

Castletown Regeneration

Leafields Development (Southwick)

Pennywell Phase 1 (Hartley Wood)

1/8
Please reload

Time Office - Stanley Harrison House

New Ludgate, Mizuho International

Shaftesbury Avenue

Metrovick House

1/4
Please reload

Newcastle City Library

Wigan Youth Zone

Blackpool Multi Storey Car Park

Seaham Multi-User Centre

1/2
Please reload

© 2016 Tolent Construction Limited (02450574). All trademarks acknowledged. All rights reserved.

Tolent Construction Limited, Ravensworth House, 5th Avenue Business Park, Team Valley, Gateshead, Tyne & Wear, NE11 0HF

  • Twitter Social Icon
  • LinkedIn Social Icon
Tolent Landscape_edited.jpg
  • Grey LinkedIn Icon
  • Grey Twitter Icon